Operation of 2 MW SES in Kapshagai, Almaty region

oj

As of 02.02.2017, the solar power plant with an installed capacity of 2 MW is operating as planned.

  • in 2015, the current repairs of all electrical equipment of the 2 MW SES were carried out. The necessary complex tests of power equipment were carried out.
  • since 01.10.2014, an agreement has been concluded with LLP "Settlement and financial center for support of renewable energy sources" for the purchase of electricity at a fixed rate;
  • from " 01 "January 2016 to" 31 " December.In 2016, the 2 MW Solar power plant in Kapshagai produced electricity in the amount of 3,267 thousand kWh , including 3,154 thousand kWh delivered to the electric network.
  • In 2016, Samruk-Green Energy LLP prevented more than 1,685 thousand tons of CO2 emissions into the atmosphere.

Data as of 11.05.2017

0c2 spravka 11.05.20170


SES-2mW in Kapshagai

Data

1.

Current load, MW

0,4

2.

Current solar radiation, W/m2

215

3.

Air temperature, °С

18

4.

Wind speed, m / s

5,2

5.

Meteorological conditions

Dull

6.

Maximum load, MW

1,6

7.

Maximum solar radiation, W/m2

1102

8.

Electricity production volume, kW / h

11540

 

  1. 1. When the wind speed is more than 12 m/s, the tracker part takes a horizontal position, the efficiency is reduced by 50%.
  2. 2. When solar radiation is less than 1000W / m2 according to the technical data.for PV modules, the power of the modules decreases in proportion to the intensity of solar radiation.