Sun energy:

  • Execution of the project “Solar power plant with capacity of 2 MW in Kapshagai city” was brought into operation in in October, 2014;
  • Placement and installation of Energy storage system EnergyPod to demonstrate its performance and ability to carry out the practical appointment.
  • Construction of 50 MW SPP “Solar-Park” near Kapshagai city. Possibility of implementation of the project together with "Astana-Solar" LLP and "Kazatomprom-Demeu" LLP is considered.
  • Construction of 1 MW SPP within the framework of the signed “Agreement between the Government of the Republic of Kazakhstan and the Government of the People's Republic of technical assistance as grant assistance to the Government of the Republic of Kazakhstan Government of the People's Republic of China”.